This project included the design and construction of a 500 gpm (expandable to 2,000 gpm) water treatment plant to provide an alternate and dependable water source for the Town of Santa Claus, Indiana.
The plant was needed for iron removal and softening and disinfection of the water. Components included a Dualator III filtration system, softener units and the addition of various treatment chemicals.
Included in the design was a clear well, backwash holding tank and two high service pumps. This project also included the design and construction of 12 miles of 16” water main.
Project Features:
- Water Source Identification and Development
- Preparation of Plans/Specifications
- Capacity Calculations
- Utility Company/Highway Department Coordination
- Construction Inspection
Project Details:
- Project Location: Santa Claus, Indiana
- Project Contact: Dave Eberenz, Matt Robinson
- Project Scope: Water Treatment Plant, Water Main Design