This project consisted of final design for approximately 5,000 feet of roadway along Corydon-New Middletown Road beginning at the existing bridge over Little Indian Creek. Work consisted of producing final construction plans, right-of-way plans, utility relocation plans, right-of-way acquisition, surveying and geotechnical work.
The geotechnical work associated with this project consisted of 10 soil borings along the centerline of the roadway alignment (locations were determined by the design engineer) and also included an analysis of soil stability issues along the west side of the roadway near the bridge.
Project Details
- Project Location: Harrison County Indiana
- Project Contact: Robert L. Woosley
- Project Scope: Roadway Design